Projects

Download Company Profile




On - Going Projects

1. Survey & Design     Full View


1. Project Name: Balance Topographical Route Survey for Pipeline for Brahmaputra Petrochemical Complex of M/s Brahmaputra Cracker and Polymer Limited at Lepetkata, Assam.

Project Status: Field team to be mobilized.

CLIENT: ENGINEERS INDIA LIMITED; 1 EIL Bhawan, 4th Floor, Bhikaiji Cama Place, New Delhi-110066, India

2. Project Name: Topography Survey & Contour Map Preparation for Construction of Secondary Tank Farm, at Naoholia, Duliajan, Assam.

Project Status: Field team to be mobilized.

CLIENT: SNC-LAVALIN Engineering India Pvt. Ltd., Vedanta Building, 4th Floor,779, Makwana Rd Off Andheri-Kurla Rd. Marol, Andheri-E, Mumbai-400 059.

3. Project Name: Preliminary Engineering cum Traffic Survey for a New BG Line from Chalsa-Jaldhaka-Digitization of Alignment.

Project Status: Project started from 27/01/2010.

CLIENT: The Dy Chief Engineer/Con/Survey, North East Frontier Railway, Maligaon, Guwahati- 781011, Assam.

4. Project Name: Preliminary Engineering - Cum Traffic Survey for new BG Line from Dellavcherra - Cheragi

Project Status: Project started from 25/01/2010.

CLIENT: NF Railway, Silchar, Assam.

5. Project Name: Contract for Line and Topographic Survey Work of Agra Water Supply (Ganga Jal) Project.

Project Status: 95% fieldwork completed.

CLIENT: Nippon Jogesuido Sekkei (NJS) Consultants Co. Ltd., Japan

6. Project Name: Carrying out Periodical checking of alignment and structure in between chainage 100/120Km to 111/366Km between station New Haflong and Jatinga Lumpur in connection with Lumding-Silchar Gauge Conversion project.

Project Stauts: 1st Phase is complete, 2nd phase will start soon.

Client: North East Frontier Railway, Lumding (Assam).

7. Project Name: Final Location Survey with geo-technical investigation, consultancy for designing and construction methodology of tunnel, sub-soil investigation for major/minor bridges and design of foundations, sub-structure and superstructure including preparation of detailed estimate and submission of bill of quantities etc. in connection with construction of new BG (Broad Gauge) railway line from Azara (ASSAM) to Byrnihat (MEGHALAYA).

Project Status: 90% completed in Meghalaya Part and remaining part i.e. in Assam delayed due to public agitation. Now, NF Railway decided to alternate the proposed alignment from Telelia to Byrnihat in lieu of Azara to Byrnihat BG line. Field work started from 18/01/2010.

CLIENT: North East Frontier Railways H.Q.
Maligaon, Guwahati-781011, Assam.

View Field Photograph.

8. Project Name: Detailed Survey of the proposed BG Alignment indicating formation level and all obligatory points checking the BG alignment and other details including fixing of concrete pillers and others Geological information from km 80.120 to 100.620 between station Dautohaja to New Haflong (Diverted alignment), in connection with Lumding-Silchar Gauge Conversion project under Dy.CE/CON/LMG-II.

Project Stauts: 40% completed and remaining part delayed due to local problem in the site.

Client: North East Frontier Railway, Lumding (Assam).


Completed Projects -

1. Project Name: Reconnaissance Engineering-Cum-Traffic Survey for a new BG line from Salona-Khumtai Digitization of Alignment.

CLIENT: NF Railways Maligaon Con(Surv)
Asssam

2. Project Name: Conducting of Reconnaissance Engineering Field Survey, for the New BG (Broad Gauge) railway line Route- From Rupai (Assam) to Parashuramkunda (Arunachal Pradesh) via Mahadevpur, Namesai, Chingkham.

CLIENT: North East Frontier Railway,Dibrugarh-786001, Assam
Guwahati-781001, Assam.

3. Project Name: Geo-referenced Cross-section Surveys of 20 Plots in KOHIMA CITY.

CLIENT: SMEC India Pvt. Ltd.
Guwahati-781001, Assam.

4. Project Name: Amendment of contract no. AM/02/092 dated 23rd May 08 for carrying out the Route Survey for Amguri field.

CLIENT: CANORO Resources Limited, Calgary Canada.
Guwahati-781001, Assam.

5. Project Name: Contract for carrying out for reconnaissance survey for proposed pipeline alignment from well 14 to Amg # 6 EPS.

Client: CANORO Resources Limited, Calgary Canada.

6. Project Name: Contract for carrying out the Additional Route Survey for Jhanzi to Amguri AM 6 in Jorhat District.

Client: CANORO Resources Limited, Calgary Canada.

7. Project Name: Pipeline Route Survey for Brahmaputra Petrochemical Complex of M/s Brahmaputra Cracker & Polymer Ltd. at Lapetkata, Assam.

CLIENT: ENGINEERS INDIA LIMITED,
1 EIL Bhwan, 4th Floor, Bhikaiji Cama Place,
New Delhi-110066, India, Tel: +91-11- 26102121.

8. Project Name: Geo Technical Investigation for Hindustan Paper Limited.

CLIENT: Hindustan Paper Corporation Limited, Nagaon Paper MIll, Kagajnagar, Morigaon, Assam.

9. Project Name: Conducting of Reconnaissance Engineering Field Survey, for the New BG (Broad Gauge) railway line Route- From Rupai (Assam) to Parashuramkunda (Arunachal Pradesh) via Mahadevpur, Namesai, Chingkham.

CLIENT: North East Frontier Railway,
Dibrugarh-786001, Assam.

10. Project Name: Conducting of Reconnaissance Engineering Field Survey, for the New BG (Broad Gauge) railway line Route- from Byrnihat (Meghalaya) to Shillong (Meghalaya).

CLIENT: North East Frontier Railways H.Q.
Maligaon, Guwahati-781011, Assam.

11. Project Name: Detailed Survey of the proposed BG Alignment indicating formation level and all obligatory points checking the BG alignment and other details including fixing of concrete pillers and others Geological information from km 80.120 to 100.620 between station Dautohaja to New Haflong (Diverted alignment), in connection with Lumding-Silchar Gauge Conversion project under Dy.CE/CON/LMG-II.

CLIENT: North East Frontier Railway,
Lumding (Assam).

12. Project Name: Carrying out Periodical checking of alignment and structure in between chainage 100/120Km to 111/366Km between station New Haflong and Jatinga Lumpur in connection with Lumding-Silchar Gauge Conversion project.

CLIENT: North East Frontier Railways
Lumding (Assam).

13. Project Name: Contract for carrying out the Pipeline Route Survey for Amguri Field.

CLIENT: CANORO Resources Limited,
2nd Floor, GHCL Building, B-38, Institutional Area, Sector-1, Noida-201301.

14. Project Name: GIS Mapping of villages with 11KV - 33KV Power Line survey in the district of

1. Gonda
2. Bahraich & Sravasti
3. Jalaun, Hamipur & Mahoba
4. Jhansi & Lalitpur
5. Banda & Chitrakoot

in the state of Uttar Pradesh under RGGVY Scheme including Main Line and Spur Line and Transformer & Conductor details etc and Complete plan of 33KV new lines and sub-station.


CLIENT: IVRCL Infrastructures & Projects Limited,
Maligaon, Guwahati-781011, Assam.

15. Project Name: Hiring of Services for fixing of 450 reference points by using DGPS in Dibru - Saikhowa National Park (DSNP) area.

CLIENT: Oil India Limited, North East Frontier (NEF) Project,
Duliajan, Assam.

16. Project Name: Topographical Survey of Guwahati City Roads for Design of water supply, sewerage and storm water drainage network: As a part of the JNNURM project, we have completed survey of city roads & roadside drain within a short period of 60days. Total length surveyed is about 1000km. Survey was completed using Total station and High Precision DGPS.

Client: Guwahati Metropolitan Development Authority through Tahal Consulting Engineers, Delhi.

17. Project Name: Topographical Survey at of Adhunik Cement Ltd area (247.25 Ha. Area) at Thangskai village, Jaintia Hills District, Meghalaya.

Client: M/s Adhunik Cement Ltd., Meghalaya.

18. Project Name: Topographical Survey using Total Station with Contour interval of 5 Meter land use / land cover of the Plant Site of approximately 26 Hectre of India Carbon Ltd campus.

Client: Assam Remote Sensing Application Center-ARSAC.

19. Project Name: Creation of digital database of Cadastral maps of Dimapur town area and developing GIS based information, for the Deputy Commissioners, Dimapur- 2002.

Client: India Carbon Limited, Guwahati (Assam).

20. Project Name: Topographical Survey at India Carbon Ltd, Madgharia site.

Client: India Carbon Limited, Guwahati (Assam).

21. Project Name: Topographical Survey for 2X3 MW Lungnit Small H.E. Project.

Client: Assam Power Generation Corporation Ltd. (APGCL) through M/s P. Das & Co. Guwahati (Assam).

22. Project Name: Land-man (including - bench mark transfer, topographical survey, identification & survey of suitable access road from existing main road/ National Highway, land acquisition including cadastral survey) survey

1. for AA-ON/7 Block, Borkathani
2. at Dholakharia in AA-ON/7 Block
3. at Amguri Oil Field
4. at Sonakhet in AA-ON/7 Block


Client: CANORO Resources Limited, Calgary Canada.

23. Project Name: Collection of Topographical field data including Hydrographic of river Brahmaputra and its tributaries covering entire Majuli Island (90 Km. reach of river Brahmaputra) and preparation of Maps, Reports and particulartl of the bank lines of river for Hydraulic model study to be laid at NEHARI. [Out of the total work, 20% is topography and rest 80% is hydrographic survey].

Client: Brahmaputra Board, Govt. of India, Guwahati (Assam).

24. Project Name: Geotechnical study of river Burhi Dihing in Dibrugarh district of Assam.

Client: Oil India Limited, Pipeline Department, Guwahati.

25. Project Name: Geo Technical Survey for township land of 750 Bighas at Noonmati, Guwahati.

Client: Shristi Riverine Pvt Ltd, Guwahati (Assam).

26. Project Name: Carrying out Pipeline Survey from Well No-6 to existing A.G.C.L gas pipeline at Amguri (Length 1.2Km) against Service Order No-AN7/B/02/082A dt.10/10/2007.

Client: CANORO RESOURCES Limited, Calgary, Canada.

27. Project Name: Carrying out Pipeline Alignment Survey at Amguri (from Majnoi to AM-6) (Length 1.1Km) against Service Order No- AM/B/02/236, dt.15/09/2008.

Client: CANORO RESOURCES Limited, Calgary, Canada.

28. Project Name: Road alignment and bridge survey for Tura PWD, Meghalaya,

Client: PWD Meghalaya.

29. Project Name: Topographical Survey for Hydel power project of NEEPCO Doimukh.

Client: NEEPCO

30. Project Name: GPS based survey for rural electrification project for 3 districts – Kamrup, Jorhat and Morigaon under the ADB project of ASEB undertaken for NRECA International Virginia USA. Completed on Dec 2004.

GPS based survey for Gas pipeline alignment:

1. Duliajan- Numaligarh (196.5km)
2. Bhagjan- Duliajan (32.7km)
3. Chabua – Duliajan (18km)


Client: Assam Gas Company Limited, Duliajan, Assam.

31. Project Name: OIL (PL) HQ. Township mapping and creation of digital database through GPS survey.

Client: OIL India Limited.



We are now also small business partner of Microsoft Corporation.   
                                    