Survey & Design: |
|
|
|
NEW PROJECT AWARDED BY EIL India
Pipeline Route Survey - Carryout reconnaissance survey, centerline survey on routes identified by company, detailed survey on approved route including collection of population density & Carriying out soil investigation including laboratory test for M/S Brahmaputra Cracker and Polymer Limited at Lepetkata, Assam.
Project duration : 04 month
Project started from: 06-06-2008
|
|
|
|
On-going
Project |
|
|
|
For Indian Railways:
1.
Final Location survey and geo-technical investigation,
consultancy for designing and construction methodology of
tunnel, sub-soil investigation for major/minor bridges and
design of foundations, sub-structure and superstructure
including preparation of detailed estimate and submission of
bill of quantities etc. in connection with construction of new
BG (Broad Gauge) railway line from Azara (ASSAM) to
Byrnihat (MEGHALAYA).
Project starting date:16th Aug.2007
Click
here to view field photograph
2.
Re-checking and redesigning of Tunnels, Bridges etc. and
fixing of concrete pillars indicating proposed formation level
and other details at all the obligatory points of New BG
alignment from Lumgding to Silchar (from Chainage- 100.12Km to
111.366 Km).
Project starting date:05th February, 2007.
|
|
|
|
|
|
|
|
Project
under RGGVY - Rajiv Gandhi Gramin Vidyutikaran Yojna- Uttar Pradesh:
GPS (HH) and
Laser Disto, based mapping and GIS database creation of 3251
individual villages covering 10 districts of Uttar Pradesh - GONDA,
BAHRAICH, SHRAWASTI, MAHOBA, JALAUN, HAMIRPUR,
BANDA, CHITRAKUT,JHANSI and LALITPUR. Project is being carried
out for- IVRCL, Lucknow.
Project starting date: 1st August, 2006
|
|
|
|
Completed Projects: |
|
|
|
LUNGNIT SMALL HYDRO ELECTRIC PROJECT
STAGE-I & II (2X3.0 MW) -LUNGNIT, KARBI ANGLONG :
Topographical survey of the entire Canal/Water Conductor System (Both stage -II
and stage -I) 5.6km along with Wire Sites, Penstock, Power
Sites, Switch yard & detailed Cross section of River at Wire
Sites for ASSAM POWER GENERATION CORPORATION LTD. (APGCL)
Survey Starting Date:
17-02-2008
Survey End Date:
16-03-2008
Report submission date:
03-04-2008
Click
here to view field photograph
|
|
|
|
|
|
|
|
Topographical
Survey of Guwahati City Roads and Road-side Drains:
Topographical Survey of Guwahati City Roads and road-side
drains for design of Water Supply,
Sewerage and Storm Water Drainage Network under JNNURM
(Jawaharlal Nehru Urban Renewal Mission) Project. This
survey was completed within a span of 3 months covering
about 1000km of roads & drains. This project was done for
TAHAL Consulting Engineers Ltd, Tel Aviv, Israel.
|
|
|
|
|
|
|
|
Topographic
and Hydrographic Survey of entire Majuli island:
Over 100 sq km area
covering south bank upto Nimati Ghat and North bank Kherkotia river
and 10km upstream of Subansiri was surveyed in 2005 and genereted the
following outputs:
►
master plan
for preparation of flood mdel for next 200 years
►
cross-section of Majuli & Brahmaputra River at 500 meter
interval for a stretch of 110Km.
►
Long-section of river bed of Brahmaputra River. |
|
|
|
|
|
|
|
Gas Pipeline
Alignment project for AGCL:
1.
GPS based survey for Gas pipeline alignment for Assam Gas
Company Limited for Numaligarh - Duliajan 194km length.
2.
GPS based
survey for Gas pipeline alignment (63km) for Assam Gas Company
Limited for Bhagjan- Duliajan and Chabua – Duliajan for AGCL. |
|
|
|
|
|
|
|
Township mapping:
Oil India Limited (PL) HQ. township mapping and creation of
digital database through GPS survey. |
|
|
|
|
|
|
|
Digital Road Map
of Guwahati City:
Digital Road map of
Guwahati
City surveyed with GPS– a customized GIS based application
with all utility information for entire Greater Guwahati. |
|
|
|
|
|
|
|
Road Alignment
Project:
Road alignment and bridge survey for Tura, PWD- Meghalaya. |
|
|
|
|
|
|
|
GPS based survey
for electrical network:
GPS
based survey for rural electrification project for 3 districts – Kamrup, Jorhat and Morigaon under the ADB project of ASEB undertaken for NRECA International Virginia USA. (Dec 2004) |
|
|
|
|
|
|
|
Topographic
& Hydrographic Survey
Topographical
& Hydrographic Survey of the six major Rivers of Assam namely Burhidehing, Disang, Dikhow, Janjhi, Bhogdoi & Dhansiri River for
construction of new AGCL Gas Pipeline (2005). |
|
|
|
|
|
|
|
Topographical &
Geo-Technical Survey:
Topographical &
Geo-Technical Survey (Soil Resistivity/Soil Stratification/Line Location
with TPS) - A study undertaken for Assam Gas Company Ltd. (AGCL) for
the proposed Gas pipeline location from (Madhuban) Duliajan to (Numaligarh)
Golaghat on OIL ROW (Right of Way). 2006. |
|
|
|
|
|
|
|
Landman Survey:
Landman
Survey for AA-ON/7 block in Assam. This survey
includes - LAND SURVEY,
ACQUISITION, DEMARCATION OF APPROACH ROAD FROM N.H / APPROACH
ROAD ALIGNMENT to the Drilling
Location etc. |
|
|
|
|
|
|
|
Project for
CANORO-Carrying out the Pipeline Survey from Well No. 6 to
existing A.G.C.L gas pipeline at Amguri Block.
Project consist of::
To physically survey and fixing the actual drilling location by
using:
*
Reconnaissance survey & Reporting.
* Detail
survey of the identified proposed pipeline alignment for
connecting the Gas Pipeline from well no.6 of CRL to AGCL gas
pipeline present on the Dhodarali road, Amguri.
Target:
45 days from
the award of contract.
Project
starting date:
10/10/2007
Project
completed and submitted:
27/11/2007 |
|
|
|
|
|
|
|
|