Environmental Impact Assessment -Environmental Management Plane

On-going Projects

 
  • Pre-Seismic Environmental Impact Assessment study in NELP-III Block AA-ONN-2001/4 & NELP-IV Block AA-ONN-2002/4 in NAGALAND for OIL AND NATURAL GAS CORPORATION LIMITED.(ONGCL)

  • Rainwater  harvesting project at Administrative building of Guwahati Refinary.
    Designing & Estimate prepration
    Collection, Compilation and Analysis of baseline data 
    Field verification and data collection
    Final report submited -  Date: 15/03/2008

  • Environmental Impact Assessment (EIA-EMP) to ascertain the base level data, Pre- Seismic Survey of the Block AA-ON/7, covering Assam & Nagaland (Belt of Schuppen). This is assigned to us by CANORO RESOURCES LIMITED, Calgary, Canada.

  • For carrying out the Rapid Environmental Impact Assessment as per APCB norms for 10 wells at Amguri field.
    The study incorporate the following items:
    Characterization of existing environmental status (base line)
    Water Samples (Surface Ground Water)
    Ambient air quality
    Ambient noise level
    Soil characterization and ecology (Flora & Fauna) evaluation.
    Project target: 45 days
    Start Date: 10/10/2007.

  • Environmental Impact Assessment Study for the proposed Amguri Block: AA-ONN-2004/1 Seismic Survey, for OIL INDIA LIMITED.

  • Environmental Impact Assessment (EIA-EMP) for OIL India Limited - 1X20 MW proposed New Gas Turbine Power Station Project at Duliajan (OIL Industrial Area). We are also required to carryout the Rapid Risk Analysis (RRA) study also. (Draft report submitted to client)

 

Completed Projects

  • Kameng Hydel Power Project of NEEPCO, study of the drainage basin, catchments area, geology, Geomorphology, slope, and vegetation etc. including EIA study for Arunachal Pradesh Remote SAC –2002

  • Tipaimukh Hydel Power Project of NEEPCO, study of the drainage basin, catchments area, geology, geomorphology, slope, and vegetation etc. including EIA study for AFC, New Delhi –2004.

  • CANORO RESOURCE Limited, Calgary, Canada – EIA- EMP studies for Amguri oil field and GGS station as turnkey project up to getting approval –NOC from APCB, Assam

  • Integrated Drainage Development project for few identified affected tea gardens in Assam and Landslide related study for Darjeeling Himalayas , Project from Tocklai Experimental Centre, Jorhat –  2004-2005.

  • A report on environment impact assessment study on oil pipeline row starting from (Madhuban) Duliajan to (Numaligarh) Golaghat for the proposed pipeline laying project of AGCL was prepared for Assam Gas Company Limited, Duliajan, Assam.- completed 2005.

  • EIA & EMP study carried out with reference to Seismic Data Acquisition Project covering –Dergaon, Titabor, Moriani & Naginajan for CANORO RESOURCES Limited, Calgary Canada.  

  • Rapid Environment Impact Assessment Study (REIA) for Amguri Field (Jorhat) Assam. This Study include - characterization of existing environmental status (base line)-water samples (surface and ground water), ambient air quality, ambient noise level & soil characterization and ecology (flora & fauna) evaluation.

  • EIA-EMP study based on seismic data acquisition in Block Number AA ONN 2003/2 in Kharsang district of Arunachal Pradesh. Project from Geopetrol International Inc.-completed 2006.

  • Rapid Environment Impact Assessment Study (REIA) For AA-ON/7 Block (Golaghat) Assam. This Study include - characterization of existing environmental status (base line)-water samples (surface and ground water), ambient air quality, ambient noise level & soil characterization and ecology (flora & fauna) evaluation.

TOP

 
On Going Projects
Final Location survey and geo-technical investigation, consultancy for designing and construction methodology of tunnel, sub-soil investigation for major/minor bridges and design of foundations, sub-structure and superstructure including preparation of detailed estimate and submission of bill of quantities etc. in connection with construction of new BG (Broad Gauge) railway line from Azara (ASSAM) to Byrnihat (MEGHALAYA) (Project started from 16th Aug.2007)

 

Environmental Impact Assessment (EIA-EMP) to ascertain the base level data, Pre- Seismic Survey of the Block AA-ON/7, covering Assam & Nagaland (Belt of Schuppen). This is assigned to us by CANORO RESOURCES Ltd, Calgary, Canada (Draft report submitted awaiting approval.)

 

Digitization of Cadastral maps of Greater Guwahati Re-settlement operation including G.I.S. base software for maps and land record data customization. (We have completed 60% of the work.)
Environmental Impact Assessment (EIA-EMP) for OIL India Limited - 1X20 MW proposed New Gas Turbine Power Station Project at Duliajan (OIL Industrial Area). We are also required to carryout the Rapid Risk Analysis (RRA) study also. (We have just completed the primary sampling and data collection.)
For carrying out the Rapid Environmental Impact Assessment as per APCB norms for 10 wells at Amguri field.
Environmental Impact Assessment Study for the proposed Amguri Block: AA-ONN-2004/1 Seismic Survey, for OIL INDIA LIMITED.
Reconnaissance Engineering cum traffic survey for construction of new Railway bridge over River Brahmaputra at Saraighat.
Rain water harvesting project at Administrative building of Guwahati Refinery for INDIAN OIL CORPORATION Ltd. 
(Final report Submitted.)
 
 

 
 

 